An aluminum plant in South Africa needed a metallurgical double girder overhead crane for an existing production building. The crane had to combine a 30-ton main trolley with a 10-ton auxiliary trolley while matching the installed runway, restricted headroom and the plant’s plan to add a second crane later.
We coordinated the lifting envelope, main and auxiliary trolleys, control arrangement, travel protection, coating system and overseas transport as one project. The two main girders, trolley, end carriages and electrical equipment were packed and shipped separately so that each long, assembled or boxed component received an appropriate form of protection and loading.


The runway position and available headroom were already fixed, so a standard crane height could not simply be applied. We checked the vertical relationship among the bridge, trolley, lifting attachment and roof structure against the 25.010 m span. A raised end-carriage arrangement was then used to set the main lifting height at 10 m and the auxiliary lifting height at 12 m.
Both hoisting mechanisms are installed on the same trolley frame. The 30-ton main trolley performs the primary metallurgical lifting duty, while the 10-ton auxiliary trolley supports secondary handling. The plate-hook lifting beam works with the main trolley. Variable-speed control for hoisting, trolley travel and crane travel allows different speeds to be selected for loaded movement and final positioning.
The metallurgical double girder overhead crane uses a push-button radio remote as its primary control, allowing the operator to choose a suitable observation point. A separately routed pendant provides backup operation in an emergency, and the two control paths are arranged so they do not interfere with each other.
Absolute encoders and correction limits support crane position sensing and travel alignment. Two laser anti-collision devices provide an additional layer of protection for crane travel. The power supply was planned for two cranes, leaving an interface for the future unit and reducing the extent of later changes to the main power system.
The main girders use a box structure. Before bridge assembly, the girder sections, internal stiffeners, connection points and relative positions of the two girders were checked against the final drawing. This confirms that the girder geometry, end-carriage interfaces and trolley-related positions are coordinated before coating and shipment, reducing the risk of difficult bridge assembly or excessive adjustment after arrival in South Africa.
Welding checks focused on weld locations, drawing callouts and critical trolley-frame connections. Where the third-party review required clearer weld information, the drawings were supplemented with welding symbols and requirements. The inspection response required the affected trolley frame to be remanufactured. Resolving these points in the workshop kept questionable load-bearing work from moving into assembly, coating and shipment.


The steelwork was prepared to Sa 2.5 before painting to remove rust and contaminants that could reduce coating adhesion. The specified system combines an epoxy zinc-rich primer, an epoxy micaceous iron oxide intermediate coat and an epoxy topcoat, with a total dry-film thickness of 125–150 μm.
The three coats provide base corrosion protection, an intermediate barrier and surface protection:
During application, a coating-thickness gauge was used to check individual layers. The purpose was to confirm that the coating formed the required continuous film and to detect thin or uneven areas before the next stage. For a metallurgical overhead crane that would travel by sea and then work inside an aluminum plant, these process checks helped turn the coating specification into verified work on each layer instead of relying only on the final color and appearance.


The packing method was selected according to component size, surface condition and handling requirements so that long sections, the assembled trolley and smaller accessories received appropriate protection:


After packing, each component was matched with transport equipment according to its dimensions and handling requirements:
This split was more than a way to separate the shipment. It matched the long girders, assembled trolley and smaller parts with suitable transport equipment, avoided unnecessary disassembly and left workable space for lifting points, tie-downs and waterproof covering.


The metallurgical double girder overhead crane has been erected on the plant runway in South Africa, with the bridge, trolley, platforms, guardrails and electrical equipment in position. The arrangement allows the main and auxiliary trolleys to cover the production area while retaining bridge access for inspection and maintenance.



If your aluminum production workshop also requires a metallurgical overhead crane with main and auxiliary trolleys, provide the workpiece, main and auxiliary capacities, span, runway-beam elevation, required lifting height, power supply, operating temperature, control method, lifting attachment, travel distance and site transport conditions. DGCRANE can then check the crane envelope, trolley mechanism arrangement, plate-hook lifting beam, protection systems, power interface and split transport plan against the building.