{"id":6351,"date":"2024-01-26T02:01:22","date_gmt":"2024-01-26T02:01:22","guid":{"rendered":"https:\/\/www.dgcrane.com\/?post_type=posts&#038;p=6351"},"modified":"2024-05-30T08:52:13","modified_gmt":"2024-05-30T08:52:13","slug":"1-set-steel-warehouse-structure-delivered-to-chile","status":"publish","type":"posts","link":"https:\/\/www.dgcrane.com\/sv\/posts\/1-set-steel-warehouse-structure-delivered-to-chile\/","title":{"rendered":"1 set st\u00e5llagerstruktur levereras till Chile"},"content":{"rendered":"<p>Detta \u00e4r en fabriksbyggnad med 3 enheter, tv\u00e5 av dem \u00e4r installerade 2 upps\u00e4ttningar av 15 ton <a href=\"https:\/\/www.dgcrane.com\/sv\/products\/single-girder-eot-cranes\/\">enbalks traverskranar<\/a>, och resten \u00e4r bara f\u00f6r lagrings\u00e4ndam\u00e5l, utan n\u00e5gon traverskran installerad inuti.<\/p>\r\n<p>I det f\u00f6rsta skedet designade vi metallkonstruktionerna efter kundens m\u00e5tt och krav, Kunden gjorde \u00e4ndringar i designen och slutligen tillhandah\u00f6ll vi en l\u00f6sning enligt kundens design, best\u00e4llningen slutf\u00f6rdes efter n\u00e4stan 3 m\u00e5naders f\u00f6rhandlingar.<\/p>\r\n<p>St\u00e5lverkstaden \u00e4r helt\u00e4ckt, fram och gavel \u00e4r f\u00f6rsedda med skjutd\u00f6rrar. H\u00e4r \u00e4r de slutliga 3D-designritningarna:<\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/3D-design-of-metal-structure.png\" alt=\"\" width=\"554\" height=\"200\" class=\"alignnone size-full wp-image-6352\"><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/3D-design-of-steel-structure.png\" alt=\"\" width=\"554\" height=\"171\" class=\"alignnone size-full wp-image-6356\"><\/p>\r\n<p>Alla balkar och pelare \u00e4r m\u00e5lade med 0,5 timmars brands\u00e4ker m\u00e5lning (F30), vi applicerade dem i v\u00e5r verkstad.<\/p>\r\n<p>Nedan \u00e4r produktionsbilderna:<\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-1.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1080\" class=\"alignnone size-full wp-image-6357\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-1.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-1-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-2.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1080\" class=\"alignnone size-full wp-image-6358\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-2.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-2-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-3.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1080\" class=\"alignnone size-full wp-image-6359\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-3.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-3-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-4.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1080\" class=\"alignnone size-full wp-image-6361\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-4.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-4-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-5.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1080\" class=\"alignnone size-full wp-image-6362\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-5.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-5-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-6.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1080\" class=\"alignnone size-full wp-image-6363\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-6.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-production-6-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-1.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1440\" class=\"alignnone size-full wp-image-6365\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-1.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-1-1536x1152.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-2.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1440\" class=\"alignnone size-full wp-image-6366\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-2.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-2-1536x1152.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-3.jpg?w=1000\" alt=\"\" width=\"1920\" height=\"1440\" class=\"alignnone size-full wp-image-6367\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-3.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/beams-with-fire-painting-3-1536x1152.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\r\n<p>F\u00f6r att undvika skador under lastning och korrosionstransport \u00e4r bekl\u00e4dnadssystemen alla skyddade med vattent\u00e4t duk. Nedan \u00e4r bilderna p\u00e5 containerladdningen:<\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-loading-3.png\" alt=\"\" width=\"1000\" height=\"562\" class=\"alignnone size-full wp-image-6369\"><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-loading-1.jpg?w=1000\" alt=\"\" width=\"1000\" height=\"562\" class=\"alignnone size-full wp-image-6370\"><\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/01\/steel-structure-loading-2.jpg?w=1000\" alt=\"\" width=\"1000\" height=\"562\" class=\"alignnone size-full wp-image-6371\"><\/p>\r\n<p>Vi kan inte bara tillhandah\u00e5lla kranl\u00f6sning, utan ocks\u00e5 den kompletta st\u00e5lverkstadsl\u00f6sningen. Ber\u00e4tta bara f\u00f6r mig dina m\u00e5tt och krav, v\u00e5rt tekniska team kommer att ge dig de mest professionella l\u00f6sningarna.<\/p>","protected":false},"excerpt":{"rendered":"Detta \u00e4r en fabriksbyggnad med 3 enheter, tv\u00e5 av dem \u00e4r installerade 2 upps\u00e4ttningar av 15 tons enkelbalkar, och resten \u00e4r bara f\u00f6r lagrings\u00e4ndam\u00e5l, utan n\u00e5gon traverskran installerad inuti. I det f\u00f6rsta skedet designade vi metallkonstruktionerna enligt kundens m\u00e5tt och krav, Kunden gjorde \u00e4ndringar i [\u2026]","protected":false},"featured_media":6352,"parent":0,"menu_order":0,"template":"single-case.php","posts_category":[4],"posts_tag":[343,7,344,345,6,215,346,347],"class_list":["post-6351","posts","type-posts","status-publish","has-post-thumbnail","hentry","posts_category-cases","posts_tag-chile","posts_tag-crane","posts_tag-dgcranae","posts_tag-metal-structure","posts_tag-overhead-crane","posts_tag-steel-structure","posts_tag-steel-warehouse","posts_tag-steel-warehouse-building"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/xmxposts\/6351"}],"collection":[{"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":4,"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/xmxposts\/6351\/revisions"}],"predecessor-version":[{"id":7894,"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/xmxposts\/6351\/revisions\/7894"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/media\/6352"}],"wp:attachment":[{"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/media?parent=6351"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/posts_category?post=6351"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.dgcrane.com\/sv\/wp-json\/wp\/v2\/posts_tag?post=6351"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}