{"id":17739,"date":"2026-11-24T02:50:06","date_gmt":"2026-11-24T02:50:06","guid":{"rendered":"https:\/\/www.dgcrane.com\/?post_type=posts&#038;p=17739"},"modified":"2026-11-24T02:50:10","modified_gmt":"2026-11-24T02:50:10","slug":"south-africa-metallurgical-double-girder-overhead-crane","status":"publish","type":"posts","link":"https:\/\/www.dgcrane.com\/pt\/posts\/south-africa-metallurgical-double-girder-overhead-crane\/","title":{"rendered":"Ponte rolante metal\u00fargica de viga dupla para uma f\u00e1brica de alum\u00ednio na \u00c1frica do Sul."},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><p>\u00cdndice<\/p><nav><ul><li><a href=\"#project-brief\">Resumo do projeto<\/a><\/li><li><a href=\"#metallurgical-double-girder-overhead-crane-configuration\">Projeto do guindaste para a f\u00e1brica de alum\u00ednio existente<\/a><ul><li><a href=\"#fitting-both-hoists-within-the-existing-building-headroom\">Acomoda\u00e7\u00e3o de ambos os carrinhos dentro da altura livre existente do edif\u00edcio.<\/a><\/li><li><a href=\"#remote-primary-control-with-an-emergency-pendant\">Controle prim\u00e1rio remoto com pingente de emerg\u00eancia<\/a><\/li><li><a href=\"#dimensional-and-welding-checks-keep-problems-out-of-site-assembly\">Verifica\u00e7\u00f5es dimensionais e de soldagem evitam problemas na montagem em campo.<\/a><\/li><li><a href=\"#three-epoxy-coats-protect-the-bridge-steelwork\">Tr\u00eas camadas de ep\u00f3xi protegem a estrutura de a\u00e7o da ponte.<\/a><\/li><\/ul><\/li><li><a href=\"#packing-and-shipping-each-component-for-its-transport-method\">Embalagem e envio de cada componente para seu m\u00e9todo de transporte.<\/a><\/li><li><a href=\"#installed-and-positioned-in-the-aluminum-plant\">Instalado e posicionado na f\u00e1brica de alum\u00ednio.<\/a><\/li><li><a href=\"#planning-a-main-and-auxiliary-metallurgical-crane-for-an-aluminum-plant\">Planejando uma ponte rolante metal\u00fargica de viga dupla para aplica\u00e7\u00e3o similar?<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-south-africa-aluminum-plant-cover-1.png\" alt=\"\" class=\"wp-image-17760\"><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"project-brief\">Resumo do projeto<\/h2>\n\n\n\n<p>Uma f\u00e1brica de alum\u00ednio na \u00c1frica do Sul precisava de uma ponte rolante metal\u00fargica de viga dupla para um pr\u00e9dio de produ\u00e7\u00e3o existente. A ponte rolante tinha que combinar um carro principal de 30 toneladas com um carro auxiliar de 10 toneladas, al\u00e9m de se adequar \u00e0 pista instalada, \u00e0 altura livre restrita e ao plano da f\u00e1brica de adicionar uma segunda ponte rolante posteriormente.<\/p>\n\n\n\n<p>Coordenamos o envelope de i\u00e7amento, os carros principais e auxiliares, o sistema de controle, a prote\u00e7\u00e3o durante o transporte, o sistema de revestimento e o transporte mar\u00edtimo como um \u00fanico projeto. As duas vigas principais, <a href=\"https:\/\/www.dgcrane.com\/pt\/crane-trolley\/\">carrinho<\/a>As extremidades dos carros e os equipamentos el\u00e9tricos foram embalados e enviados separadamente, de modo que cada componente longo, montado ou encaixotado, recebesse uma forma adequada de prote\u00e7\u00e3o e acondicionamento.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"metallurgical-double-girder-overhead-crane-configuration\">Projeto do guindaste para a f\u00e1brica de alum\u00ednio existente<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-general-arrangement-drawing.png\" alt=\"\" class=\"wp-image-17748\"><figcaption class=\"wp-element-caption\"><em>Desenho da ponte rolante metal\u00fargica de viga dupla<\/em><\/figcaption><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Capacidade nominal: carro principal de 30 toneladas e carro auxiliar de 10 toneladas.<\/li>\n\n\n\n<li>V\u00e3o: 25,01 m<\/li>\n\n\n\n<li>Altura de eleva\u00e7\u00e3o: 10 m para o carrinho principal e 12 m para o carrinho auxiliar.<\/li>\n\n\n\n<li>Fun\u00e7\u00e3o: A8 (carrinho principal M8; carrinho auxiliar M7)<\/li>\n\n\n\n<li>Velocidade de eleva\u00e7\u00e3o: Carrinho principal 0,5\u20135 m\/min; carrinho auxiliar 1,05\u201310,5 m\/min;<\/li>\n\n\n\n<li>Velocidade de deslocamento: Trolley 2,5\u201325 m\/min; guindaste 4,6\u201346 m\/min<\/li>\n\n\n\n<li>Alimenta\u00e7\u00e3o: 400 V, 50 Hz, trif\u00e1sica<\/li>\n\n\n\n<li>M\u00e9todo de controle: Controle remoto de r\u00e1dio com bot\u00f5es como controle principal; pingente para opera\u00e7\u00e3o de emerg\u00eancia.<\/li>\n\n\n\n<li>Trilho da pista: QU70<\/li>\n\n\n\n<li>Dispositivo de eleva\u00e7\u00e3o: viga de eleva\u00e7\u00e3o com gancho de 30 toneladas<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"fitting-both-hoists-within-the-existing-building-headroom\"><strong>Acomoda\u00e7\u00e3o de ambos os carrinhos dentro da altura livre existente do edif\u00edcio.<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/trolley-machinery-assembly-scaled.jpg\" alt=\"\" class=\"wp-image-17752\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/trolley-machinery-assembly-scaled.jpg 2560w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/trolley-machinery-assembly-1536x1152.jpg 1536w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/trolley-machinery-assembly-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\"><em>Os mecanismos de i\u00e7amento principal de 30 toneladas e auxiliar de 10 toneladas foram montados na mesma estrutura do carro.<\/em><\/figcaption><\/figure>\n\n\n\n<p>A posi\u00e7\u00e3o da pista e a altura livre dispon\u00edvel j\u00e1 estavam definidas, portanto, n\u00e3o era poss\u00edvel simplesmente aplicar uma altura padr\u00e3o para o guindaste. Verificamos a rela\u00e7\u00e3o vertical entre a ponte, o carro, o dispositivo de eleva\u00e7\u00e3o e a estrutura do teto em rela\u00e7\u00e3o ao v\u00e3o de 25,010 m. Em seguida, utilizamos um arranjo de extremidade elevada para definir a altura de eleva\u00e7\u00e3o principal em 10 m e a altura de eleva\u00e7\u00e3o auxiliar em 12 m.<\/p>\n\n\n\n<p>Ambos os mecanismos de i\u00e7amento est\u00e3o instalados na mesma estrutura do carro. O carro principal de 30 toneladas realiza o i\u00e7amento metal\u00fargico prim\u00e1rio, enquanto o carro auxiliar de 10 toneladas auxilia no manuseio secund\u00e1rio. A viga de i\u00e7amento com gancho para chapas opera em conjunto com o carro principal. O controle de velocidade vari\u00e1vel para i\u00e7amento, deslocamento do carro e deslocamento do guindaste permite a sele\u00e7\u00e3o de diferentes velocidades para movimenta\u00e7\u00e3o da carga e posicionamento final.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"remote-primary-control-with-an-emergency-pendant\"><strong>Controle prim\u00e1rio remoto com pingente de emerg\u00eancia<\/strong><\/h3>\n\n\n\n<p>A ponte rolante metal\u00fargica de viga dupla utiliza um controle remoto sem fio com bot\u00f5es como controle principal, permitindo ao operador escolher um ponto de observa\u00e7\u00e3o adequado. Um botoeira independente fornece opera\u00e7\u00e3o de backup em caso de emerg\u00eancia, e os dois caminhos de controle s\u00e3o dispostos de forma a n\u00e3o interferirem um com o outro.<\/p>\n\n\n\n<p>Encoders absolutos e limites de corre\u00e7\u00e3o auxiliam na detec\u00e7\u00e3o da posi\u00e7\u00e3o da ponte rolante e no alinhamento de seu deslocamento. Dois dispositivos anticolis\u00e3o a laser fornecem uma camada adicional de prote\u00e7\u00e3o para o deslocamento da ponte rolante. O sistema de alimenta\u00e7\u00e3o foi projetado para duas pontes rolantes, deixando uma interface para uma futura unidade e reduzindo a necessidade de altera\u00e7\u00f5es posteriores no sistema de alimenta\u00e7\u00e3o principal.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"dimensional-and-welding-checks-keep-problems-out-of-site-assembly\"><strong>Verifica\u00e7\u00f5es dimensionais e de soldagem evitam problemas na montagem em campo.<\/strong><\/h3>\n\n\n\n<p>As vigas principais utilizam uma estrutura em forma de caixa. Antes da montagem da ponte, as se\u00e7\u00f5es das vigas, os refor\u00e7os internos, os pontos de conex\u00e3o e as posi\u00e7\u00f5es relativas das duas vigas foram verificados em rela\u00e7\u00e3o ao desenho final. Isso confirma que a geometria das vigas, as interfaces das extremidades do carro e as posi\u00e7\u00f5es relacionadas ao carro est\u00e3o coordenadas antes da pintura e do transporte, reduzindo o risco de montagem dif\u00edcil da ponte ou ajustes excessivos ap\u00f3s a chegada \u00e0 \u00c1frica do Sul.<\/p>\n\n\n\n<p>As verifica\u00e7\u00f5es de soldagem focaram-se na localiza\u00e7\u00e3o das soldas, nas indica\u00e7\u00f5es nos desenhos e nas conex\u00f5es cr\u00edticas da estrutura do carrinho. Quando a revis\u00e3o por terceiros exigiu informa\u00e7\u00f5es mais claras sobre a soldagem, os desenhos foram complementados com s\u00edmbolos e requisitos de soldagem. A resposta da inspe\u00e7\u00e3o exigiu a remanufatura da estrutura do carrinho afetada. A resolu\u00e7\u00e3o desses pontos na oficina impediu que componentes estruturais com problemas fossem encaminhados para as etapas de montagem, revestimento e expedi\u00e7\u00e3o.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-main-girder-fabrication.png\" alt=\"\" class=\"wp-image-17741\"><figcaption class=\"wp-element-caption\"><em>Viga caix\u00e3o durante a montagem estrutural, com as chapas da alma, as chapas de cobertura e o refor\u00e7o interno vis\u00edveis.<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-girder-dimensional-check.png\" alt=\"\" class=\"wp-image-17749\"><figcaption class=\"wp-element-caption\"><em>As dimens\u00f5es s\u00e3o medidas entre as duas vigas-caix\u00e3o para verificar o espa\u00e7amento, a posi\u00e7\u00e3o relativa e as refer\u00eancias de montagem.<\/em><\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"three-epoxy-coats-protect-the-bridge-steelwork\"><strong>Tr\u00eas camadas de ep\u00f3xi protegem a estrutura de a\u00e7o da ponte.<\/strong><\/h3>\n\n\n\n<p>A estrutura de a\u00e7o foi preparada at\u00e9 atingir a dureza Sa 2.5 antes da pintura, para remover ferrugem e contaminantes que pudessem reduzir a ader\u00eancia do revestimento. O sistema especificado combina um primer ep\u00f3xi rico em zinco, uma camada intermedi\u00e1ria ep\u00f3xi de \u00f3xido de ferro mic\u00e1ceo e uma camada de acabamento ep\u00f3xi, com uma espessura total de pel\u00edcula seca de 125\u2013150 \u03bcm.<\/p>\n\n\n\n<p>As tr\u00eas camadas proporcionam prote\u00e7\u00e3o b\u00e1sica contra corros\u00e3o, uma barreira intermedi\u00e1ria e prote\u00e7\u00e3o superficial:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Primer ep\u00f3xi rico em zinco:<\/strong> Proporciona prote\u00e7\u00e3o contra corros\u00e3o diretamente na superf\u00edcie do a\u00e7o.<\/li>\n\n\n\n<li><strong>Revestimento intermedi\u00e1rio de \u00f3xido de ferro mic\u00e1ceo ep\u00f3xi:<\/strong> Aumenta a espessura da barreira e dificulta a penetra\u00e7\u00e3o de umidade e subst\u00e2ncias corrosivas no substrato.<\/li>\n\n\n\n<li><strong>Revestimento de acabamento ep\u00f3xi:<\/strong> Protege a camada intermedi\u00e1ria, melhora a resist\u00eancia ao desgaste e facilita a limpeza da superf\u00edcie. O acabamento amarelo tamb\u00e9m melhora a visibilidade da ponte, das plataformas e dos guarda-corpos durante inspe\u00e7\u00f5es de rotina.<\/li>\n<\/ul>\n\n\n\n<p>Durante a aplica\u00e7\u00e3o, um medidor de espessura de revestimento foi usado para verificar as camadas individuais. O objetivo era confirmar se o revestimento formava a pel\u00edcula cont\u00ednua necess\u00e1ria e detectar \u00e1reas finas ou irregulares antes da pr\u00f3xima etapa. Para um guindaste de p\u00f3rtico metal\u00fargico que viajaria por mar e depois operaria dentro de uma f\u00e1brica de alum\u00ednio, essas verifica\u00e7\u00f5es de processo ajudaram a transformar a especifica\u00e7\u00e3o do revestimento em trabalho verificado em cada camada, em vez de depender apenas da cor e apar\u00eancia finais.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"2560\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/coating-thickness-check-scaled.jpg\" alt=\"\" class=\"wp-image-17753\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/coating-thickness-check-scaled.jpg 1920w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/coating-thickness-check-1152x1536.jpg 1152w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/coating-thickness-check-1536x2048.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\"><em>Um medidor de espessura de revestimento \u00e9 usado na estrutura de a\u00e7o do carrinho para verificar a pel\u00edcula aplicada.<\/em><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-finished-components.png\" alt=\"\" class=\"wp-image-17746\"><figcaption class=\"wp-element-caption\"><em>As vigas principais, plataformas, guarda-corpos e demais estruturas met\u00e1licas da ponte ap\u00f3s a aplica\u00e7\u00e3o da camada superior de tinta amarela.<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"packing-and-shipping-each-component-for-its-transport-method\">Embalagem e envio de cada componente para seu m\u00e9todo de transporte.<\/h2>\n\n\n\n<p>O m\u00e9todo de embalagem foi selecionado de acordo com o tamanho dos componentes, a condi\u00e7\u00e3o da superf\u00edcie e os requisitos de manuseio, de forma que as se\u00e7\u00f5es longas, o carrinho montado e os acess\u00f3rios menores recebessem prote\u00e7\u00e3o adequada:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Vigas principais, <a href=\"https:\/\/www.dgcrane.com\/pt\/crane-end-carriages\/\">vag\u00f5es de extremidade<\/a>, plataformas e guarda-corpos:<\/strong> Revestido com uma lona imperme\u00e1vel verde para reduzir a exposi\u00e7\u00e3o direta da pintura amarela \u00e0 chuva, umidade e sujeira durante o transporte mar\u00edtimo e em locais abertos. Uma tela externa mant\u00e9m a lona pr\u00f3xima aos perfis dos componentes e reduz a possibilidade de a cobertura se levantar, soltar ou friccionar repetidamente contra a superf\u00edcie pintada.<\/li>\n\n\n\n<li><strong>Pain\u00e9is de controle e componentes el\u00e9tricos:<\/strong> Embaladas individualmente ou protegidas de acordo com suas caracter\u00edsticas para reduzir a exposi\u00e7\u00e3o \u00e0 umidade e aos impactos durante o manuseio.<\/li>\n\n\n\n<li><strong>Acess\u00f3rios para a viga de eleva\u00e7\u00e3o de 30 toneladas com gancho para placas, cabos de a\u00e7o e acess\u00f3rios para trilho QU70:<\/strong> Agrupadas em caixas ou armazenadas separadamente, facilitando a verifica\u00e7\u00e3o da lista de embalagem e reduzindo o risco de perda de pe\u00e7as pequenas.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-2 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-waterproof-packaging.png\" alt=\"\" class=\"wp-image-17745\"><figcaption class=\"wp-element-caption\"><em>O carrinho e os acess\u00f3rios da ponte s\u00e3o cobertos com lona imperme\u00e1vel e protegidos com rede externa.<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1704\" height=\"1278\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/packed-trolley-on-trailer.jpg\" alt=\"\" class=\"wp-image-17754\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/packed-trolley-on-trailer.jpg 1704w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/packed-trolley-on-trailer-1536x1152.jpg 1536w\" sizes=\"(max-width: 1704px) 100vw, 1704px\" \/><figcaption class=\"wp-element-caption\"><em>Carrinho revestido com capa imperme\u00e1vel e rede, carregado em um reboque para transporte.<\/em><\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p>Ap\u00f3s a embalagem, cada componente foi alocado ao equipamento de transporte de acordo com suas dimens\u00f5es e requisitos de manuseio:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Duas vigas principais:<\/strong> Como esse comprimento excede o alcance pr\u00e1tico de um cont\u00eainer padr\u00e3o, as vigas foram transportadas como carga longa em navio graneleiro.<\/li>\n\n\n\n<li><strong>Carrinho montado:<\/strong> Foi carregado em uma plataforma plana, que proporcionava acesso livre pela parte superior e pelas laterais para i\u00e7amento e fixa\u00e7\u00e3o.<\/li>\n\n\n\n<li><strong>Extremidades dos carros, sala el\u00e9trica, acess\u00f3rios de eleva\u00e7\u00e3o e acess\u00f3rios ferrovi\u00e1rios:<\/strong> Distribu\u00eddo entre cont\u00eaineres abertos e outras unidades de embalagem de acordo com o tamanho e as necessidades de prote\u00e7\u00e3o.<\/li>\n<\/ul>\n\n\n\n<p>Essa divis\u00e3o foi mais do que uma simples forma de separar a carga. Ela permitiu que as vigas longas, o carrinho montado e as pe\u00e7as menores fossem transportadas em equipamentos adequados, evitando desmontagens desnecess\u00e1rias e deixando espa\u00e7o \u00fatil para pontos de i\u00e7amento, amarra\u00e7\u00f5es e cobertura imperme\u00e1vel.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-3 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1704\" height=\"1278\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/main-girder-port-lifting.jpg\" alt=\"\" class=\"wp-image-17755\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/main-girder-port-lifting.jpg 1704w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/main-girder-port-lifting-1536x1152.jpg 1536w\" sizes=\"(max-width: 1704px) 100vw, 1704px\" \/><figcaption class=\"wp-element-caption\"><em>A viga principal suportou a carga longa durante a transfer\u00eancia para o navio graneleiro.<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-trolley-flat-rack-shipping.png\" alt=\"\" class=\"wp-image-17744\"><figcaption class=\"wp-element-caption\"><em>O carrinho fica em uma plataforma plana com cobertura imperme\u00e1vel, rede e amarras.<\/em><\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"installed-and-positioned-in-the-aluminum-plant\">Instalado e posicionado na f\u00e1brica de alum\u00ednio.<\/h2>\n\n\n\n<p>A ponte rolante metal\u00fargica de viga dupla foi erguida na pista da f\u00e1brica na \u00c1frica do Sul, com a ponte, o carro, as plataformas, os guarda-corpos e os equipamentos el\u00e9tricos j\u00e1 instalados. Essa configura\u00e7\u00e3o permite que os carros principais e auxiliares cubram a \u00e1rea de produ\u00e7\u00e3o, mantendo o acesso \u00e0 ponte para inspe\u00e7\u00e3o e manuten\u00e7\u00e3o.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-installed-aluminum-plant.png\" alt=\"\" class=\"wp-image-17750\"><figcaption class=\"wp-element-caption\"><em>A ponte rolante metal\u00fargica completa abrange a \u00e1rea de produ\u00e7\u00e3o de alum\u00ednio, com as vigas principais, o carro, as plataformas, os guarda-corpos, a cabine do operador e as estruturas de extremidade instaladas na pista.<\/em><\/figcaption><\/figure>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-4 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-platform-equipment.png\" alt=\"\" class=\"wp-image-17742\"><figcaption class=\"wp-element-caption\"><em>A plataforma, os guarda-corpos, o equipamento el\u00e9trico e o carrinho est\u00e3o dispostos na ponte instalada.<\/em><\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2026\/11\/metallurgical-double-girder-overhead-crane-low-angle-installation.png\" alt=\"\" class=\"wp-image-17751\"><figcaption class=\"wp-element-caption\"><em>A vista em \u00e2ngulo baixo mostra as duas vigas principais, o mecanismo de eleva\u00e7\u00e3o do carro, as plataformas e o espa\u00e7o de trabalho abaixo do guindaste instalado.<\/em><\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"planning-a-main-and-auxiliary-metallurgical-crane-for-an-aluminum-plant\">Planejando uma ponte rolante metal\u00fargica de viga dupla para aplica\u00e7\u00e3o similar?<\/h2>\n\n\n\n<p>Caso sua oficina de produ\u00e7\u00e3o de alum\u00ednio tamb\u00e9m necessite de uma ponte rolante metal\u00fargica com carros principal e auxiliar, informe as especifica\u00e7\u00f5es da pe\u00e7a a ser trabalhada, as capacidades dos carros principal e auxiliar, o v\u00e3o, a altura da viga de sustenta\u00e7\u00e3o, a altura de eleva\u00e7\u00e3o necess\u00e1ria, a fonte de alimenta\u00e7\u00e3o, a temperatura de opera\u00e7\u00e3o, o m\u00e9todo de controle, o acess\u00f3rio de eleva\u00e7\u00e3o, a dist\u00e2ncia percorrida e as condi\u00e7\u00f5es de transporte no local. <strong>DGCRANE<\/strong> Em seguida, \u00e9 poss\u00edvel verificar o envelope do guindaste, o arranjo do mecanismo do carro, a viga de eleva\u00e7\u00e3o com gancho, os sistemas de prote\u00e7\u00e3o, a interface de energia e o plano de transporte dividido em rela\u00e7\u00e3o ao edif\u00edcio.<\/p>","protected":false},"excerpt":{"rendered":"Resumo do Projeto: Uma f\u00e1brica de alum\u00ednio na \u00c1frica do Sul precisava de uma ponte rolante metal\u00fargica de viga dupla para um pr\u00e9dio de produ\u00e7\u00e3o existente. A ponte rolante tinha que combinar um carro principal de 30 toneladas com um carro auxiliar de 10 toneladas, al\u00e9m de se adequar \u00e0 pista de rolamento instalada, \u00e0 altura livre restrita e ao plano da f\u00e1brica de adicionar uma segunda ponte rolante posteriormente. Coordenamos o i\u00e7amento [\u2026]","protected":false},"featured_media":17764,"parent":0,"menu_order":0,"template":"single-SEO-Table.php","posts_category":[4],"posts_tag":[1089,1088,78,1092,1087],"class_list":["post-17739","posts","type-posts","status-publish","has-post-thumbnail","hentry","posts_category-cases","posts_tag-aluminum-industry","posts_tag-custom-overhead-crane","posts_tag-double-girder-overhead-crane","posts_tag-dual-hoist-crane","posts_tag-metallurgical-overhead-crane"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/xmxposts\/17739"}],"collection":[{"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":7,"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/xmxposts\/17739\/revisions"}],"predecessor-version":[{"id":17763,"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/xmxposts\/17739\/revisions\/17763"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/media\/17764"}],"wp:attachment":[{"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/media?parent=17739"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/posts_category?post=17739"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.dgcrane.com\/pt\/wp-json\/wp\/v2\/posts_tag?post=17739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}