{"id":7558,"date":"2024-05-22T09:37:29","date_gmt":"2024-05-22T09:37:29","guid":{"rendered":"https:\/\/www.dgcrane.com\/?post_type=posts&#038;p=7558"},"modified":"2024-12-20T02:06:19","modified_gmt":"2024-12-20T02:06:19","slug":"overhead-crane-installation-and-after-sales-service","status":"publish","type":"posts","link":"https:\/\/www.dgcrane.com\/fr\/posts\/overhead-crane-installation-and-after-sales-service\/","title":{"rendered":"Installation de ponts roulants et service apr\u00e8s-vente"},"content":{"rendered":"<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"693\" height=\"518\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Overhead-crane-installation.png\" alt=\"Installation de pont roulant\" class=\"wp-image-7559\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">R\u00e9ceptionner des marchandises<\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"783\" height=\"701\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Receiving-goods.png\" alt=\"R\u00e9ceptionner des marchandises\" class=\"wp-image-7560\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Lorsque le client re\u00e7oit l&#39;\u00e9quipement de levage, les \u00e9l\u00e9ments suivants doivent \u00eatre v\u00e9rifi\u00e9s\u00a0:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Inspection-V\u00e9rifiez si la liste est compar\u00e9e \u00e0 l&#39;objet physique (si la quantit\u00e9 de marchandises est compl\u00e8te, si les pi\u00e8ces sont endommag\u00e9es et si les informations al\u00e9atoires sont compl\u00e8tes.)<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Quels plans de pr\u00e9paration DGCRANE fera-t-il pour vous avant l&#39;installation\u00a0?<\/h2>\n\n\n\n<p>1. Planification pr\u00e9alable \u00e0 l&#39;installation\u00a0: Plan directeur<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1808\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/drawings-scaled.jpg?w=1000\" alt=\"dessins\" class=\"wp-image-7561\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/drawings-scaled.jpg 2560w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/drawings-1536x1085.jpg 1536w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/drawings-2048x1447.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Avant l&#39;installation, nos ing\u00e9nieurs et ma\u00eetres d&#39;installation doivent communiquer avec vous les d\u00e9tails suivants pour faciliter le bon d\u00e9roulement de l&#39;installation, notamment\u00a0:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Examen des dessins de construction de l&#39;usine\u00a0:<\/strong>V\u00e9rifiez soigneusement le plan de conception du b\u00e2timent pour vous assurer que les dimensions structurelles cl\u00e9s de l&#39;usine r\u00e9pondent aux exigences des dimensions d&#39;installation de la grue.<\/li>\n\n\n\n<li><strong>Liste des mat\u00e9riaux et \u00e9quipements \uff1a<\/strong>Pendant tout le processus d&#39;installation de la grue, l&#39;installateur a r\u00e9pertori\u00e9 une liste compl\u00e8te des n\u00e9cessit\u00e9s.<\/li>\n\n\n\n<li><strong>Calendrier d&#39;installation\u00a0:<\/strong>Les installateurs ont besoin d\u2019un calendrier clair pour \u00e9viter les retards dans les travaux de construction en cours.<\/li>\n\n\n\n<li><strong>Avis d&#39;installation\u00a0:<\/strong>Confirmer le calendrier d&#39;installation, la coop\u00e9ration du personnel (ing\u00e9nieurs m\u00e9caniques et \u00e9lectriques, conseils techniques pendant le processus d&#39;installation), l&#39;avancement de la planification, la s\u00e9curit\u00e9 de la construction et le nettoyage du site\u00a0; en m\u00eame temps, il est n\u00e9cessaire d&#39;enqu\u00eater sur l&#39;environnement sur site (pr\u00e9paration des outils d&#39;installation, d\u00e9terminer la tension d&#39;alimentation du site d&#39;installation de l&#39;acheteur, pour s&#39;assurer que le client dispose des conditions de base requises pour l&#39;installation.)<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Examen sur place\uff1aSituation locale<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"716\" height=\"516\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Check-local-situation.png\" alt=\"\" class=\"wp-image-7562\"><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Les installateurs effectueront les pr\u00e9paratifs appropri\u00e9s avant d&#39;installer la grue pour garantir que les v\u00e9hicules, les machines et les \u00e9quipements d&#39;installation peuvent passer librement et assurer le bon d\u00e9roulement de l&#39;installation. Les principales consid\u00e9rations comprennent\u00a0:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>V\u00e9rifiez le degr\u00e9 de correspondance des lignes \u00e9lectriques, des alimentations \u00e9lectriques et des produits locaux du client.<\/li>\n\n\n\n<li>L&#39;\u00e9tat de la chauss\u00e9e sur le site d&#39;installation.<\/li>\n\n\n\n<li>Toiture et syst\u00e8me de plomberie.<\/li>\n\n\n\n<li>Lampes suspendues.<\/li>\n\n\n\n<li>Pr\u00e9paration du mat\u00e9riel de soudage.<\/li>\n\n\n\n<li>Nous assurerons avec chaque client les conditions de base pour l&#39;installation de la grue.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><\/li>\n<\/ul>\n\n\n\n<p>Avant l&#39;installation de la grue, les conditions d&#39;installation qui doivent \u00eatre remplies : le nettoyage du site d&#39;installation, la pr\u00e9paration des installations de s\u00e9curit\u00e9, la fourniture des conditions d&#39;alimentation \u00e9lectrique, la pr\u00e9paration des \u00e9quipements d&#39;installation, la pr\u00e9paration \u00e0 l&#39;installation de la voie ferr\u00e9e et la ligne de glissement d&#39;alimentation du chariot, etc.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Identification des dangers\u00a0: la s\u00e9curit\u00e9 avant tout<\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"648\" height=\"395\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Hazard-identification.png\" alt=\"Identification des dangers\" class=\"wp-image-7563\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cette \u00e9tape implique d&#39;identifier les dangers potentiels susceptibles d&#39;interrompre le processus d&#39;installation, tels que\u00a0:<\/li>\n\n\n\n<li>Danger \u00e9lectrique<\/li>\n\n\n\n<li>Risque m\u00e9canique<\/li>\n\n\n\n<li>Temp\u00e9rature extr\u00eame ou exposition \u00e0 des produits chimiques<\/li>\n\n\n\n<li>Pr\u00e9cautions pour le travail a\u00e9rien<\/li>\n\n\n\n<li>Tout autre risque que l&#39;installateur juge pertinent<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Test de chargement<\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Load-test.jpg?w=1000\" alt=\"Test de chargement\" class=\"wp-image-7564\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Load-test.jpg 1600w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Load-test-1536x1152.jpg 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Une fois l&#39;installation du pont roulant termin\u00e9e, il est temps de proc\u00e9der au test de charge. Les \u00e9tapes du test sont les suivantes\u00a0:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Exp\u00e9rience de fonctionnement d&#39;un palan, d&#39;une poutre de grue, d&#39;un chariot-grue<\/li>\n\n\n\n<li>Contr\u00f4le du fonctionnement des dispositifs de s\u00e9curit\u00e9<\/li>\n\n\n\n<li>Test de charge de 125% du poids de levage nominal de la grue<\/li>\n\n\n\n<li>Conservez toujours les enregistrements des tests de charge facilement accessibles pour r\u00e9f\u00e9rence future.<\/li>\n\n\n\n<li>Test de charge, test de charge dynamique (1h) et test de charge statique (3*10 min), v\u00e9rifient principalement si les fonctions de chaque m\u00e9canisme et transmission peuvent \u00eatre utilis\u00e9es.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Comment installer?<a href=\"https:\/\/www.dgcrane.com\/fr\/posts\/assembly-and-installation-of-single-girder-overhead-cranes\/\"> \u00c9tapes d&#39;assemblage du pont roulant<\/a><\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"478\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Assembly-steps-of-overhead-crane.png\" alt=\"\u00c9tapes d&#039;assemblage du pont roulant\" class=\"wp-image-7577\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>La premi\u00e8re \u00e9tape de l&#39;installation consiste \u00e0 s&#39;assurer que les mesures de protection de s\u00e9curit\u00e9 sur site sont en place, \u00e0 v\u00e9rifier si l&#39;installation de la poutre de grue est en bon \u00e9tat, puis \u00e0 mettre en \u0153uvre l&#39;installation.<br>\u00c9TAPE 1\u00a0:\u00a0Pr\u00e9-install\u00e9<br>\u00c9TAPE 2\u00a0: Assemblage et installation<br>\u00c9TAPE 3\u00a0:\u00a0Test et r\u00e9glage final<\/p>\n\n\n\n<p><strong>Service apr\u00e8s-vente que nous pouvons vous fournir\u00a0:<\/strong><\/p>\n\n\n\n<p>Dans le processus de fabrication de la grue, nous coop\u00e9rerons pleinement \u00e0 la disposition des dessins, \u00e0 la supervision du produit, \u00e0 l&#39;inspection et \u00e0 l&#39;acceptation pour garantir que vous recevez un pont roulant de haute qualit\u00e9, comme suit\u00a0:<\/p>\n\n\n\n<p><strong><em>1. \u00c0 propos du certificat de qualification<\/em><\/strong><br>DGCRANE poss\u00e8de la certification ISO, la certification CCC, la certification CE, etc., NOUS pouvons vous fournir la certification tierce du pont roulant dont vous avez besoin. \u00c0 l&#39;heure actuelle, la certification internationale des exportations comprend principalement sept cat\u00e9gories, \u00e0 savoir ISO9000, la marque CCC et la certification T\u00fcV. , certification UL, certification CE, certification RoHS, inspection des produits SGS.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>ISO (Organisation internationale de certification des normes)<\/td><td>Une alliance mondiale d&#39;agences internationales de normalisation (agences membres de l&#39;ISO).<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/ISO.png\" alt=\"Logo ISO\" width=\"200\" height=\"152\" class=\"alignnone wp-image-7587\"><\/td><\/tr><tr><td>CCC (Certification obligatoire en Chine)<\/td><td>La certification obligatoire de la Chine est appel\u00e9e CCC et la marque 3C est appel\u00e9e Transport, importation, vente et utilisation dans des services commerciaux.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/ccc-e1734659859154.png\" alt=\"logo CCC\" width=\"200\" height=\"134\" class=\"alignnone wp-image-7586\"><\/td><\/tr><tr><td>Certification T\u00dcV<\/td><td>Certification T\u00dc V Il s&#39;agit d&#39;une certification tierce d\u00e9livr\u00e9e par T\u00fcV NORD, l&#39;organisme de certification officiel du gouvernement allemand.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/TUV.png\" alt=\"Logo T\u00dcV\" width=\"200\" height=\"82\" class=\"alignnone wp-image-7585\"><\/td><\/tr><tr><td>Certification UL (Underwriter Laboratories Inc)<\/td><td>Il utilise des m\u00e9thodes d&#39;essais scientifiques pour d\u00e9terminer le degr\u00e9 de dommage ou d&#39;atteinte \u00e0 la vie et aux biens caus\u00e9 par divers mat\u00e9riaux, installations, produits, installations, b\u00e2timents, etc.\u00a0; D\u00e9terminer, pr\u00e9parer et publier des normes appropri\u00e9es et contribuer \u00e0 r\u00e9duire et \u00e0 pr\u00e9venir des vies.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/UL.png\" alt=\"Logo UL\" width=\"200\" height=\"87\" class=\"alignnone wp-image-7584\"><\/td><\/tr><tr><td>Certification CE<\/td><td>Il s&#39;agit d&#39;une marque de certification de s\u00e9curit\u00e9 et est consid\u00e9r\u00e9e comme un passeport permettant aux fabricants d&#39;ouvrir et d&#39;entrer sur le march\u00e9 europ\u00e9en.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/CE.png\" alt=\"CE\" width=\"200\" height=\"65\" class=\"alignnone wp-image-7583\"><\/td><\/tr><tr><td>SGS (Office Notarial G\u00e9n\u00e9ral Suisse)<\/td><td>Il s&#39;agit du principal organisme d&#39;inspection, d&#39;identification, d&#39;essai et de certification au monde, fournissant une large gamme d&#39;analyses physiques, chimiques et m\u00e9tallographiques, y compris des essais destructifs et non destructifs, fournissant un ensemble complet d&#39;inspections quantitatives et de qualit\u00e9 et de services techniques associ\u00e9s, et fournissant clients avec des services de pr\u00e9-test.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/SGS.png\" alt=\"GV\" width=\"200\" height=\"101\" class=\"alignnone wp-image-7582\"><\/td><\/tr><tr><td>Certification RoHS<\/td><td>Il r\u00e9glemente principalement les normes de mat\u00e9riaux et de processus des \u00e9quipements \u00e9lectriques des ponts roulants afin de les rendre plus propices \u00e0 la sant\u00e9 humaine et \u00e0 la protection de l&#39;environnement.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/RoHS.png\" alt=\"RoHS\" width=\"200\" height=\"103\" class=\"alignnone wp-image-7581\"><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><em><strong>2.<a href=\"https:\/\/www.dgcrane.com\/fr\/posts\/shipping-time-container-tracking-load-calculator-tool-secret-weapon-of-the-10-years-experienced-salesman\/\">Concernant le transport et les frais<\/a><\/strong><\/em><\/p>\n\n\n\n<p>DGCRANE fournira un emballage conforme aux normes internationales d&#39;exportation\u00a0: la poutre principale doit \u00eatre coup\u00e9e pendant le transport, et elle sera boulonn\u00e9e apr\u00e8s avoir \u00e9t\u00e9 exp\u00e9di\u00e9e vers la zone locale, ce qui est solide et fiable. L&#39;h\u00f4te est emball\u00e9 dans des bandes color\u00e9es imperm\u00e9ables, et les pi\u00e8ces de rechange et l&#39;\u00e9quipement \u00e9lectrique sont emball\u00e9s dans des caisses en bois fumig\u00e9es. DGCRANE peut fournir une vari\u00e9t\u00e9 de transports par grue, tels que le transport de conteneurs\/de marchandises en vrac\/l&#39;exp\u00e9dition LCL, le transport ferroviaire.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"697\" height=\"425\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Crane-beam-packaging.png\" alt=\"Emballage de poutres de grue\" class=\"wp-image-7590\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><em><strong>3. \u00c0 propos de notre cas d&#39;exp\u00e9rience<\/strong><\/em><br><a href=\"https:\/\/www.dgcrane.com\/fr\/posts\/installation-and-test-run-of-16-ton-overhead-cranes-in-tanzania\/\">Installation et essai d&#39;exploitation d&#39;un pont roulant de 16 t en Tanzanie<\/a><\/p>\n\n\n\n<p>Il s&#39;agit d&#39;un pont roulant monopoutre LDC d&#39;un poids de levage de 16 tonnes export\u00e9 vers la Tanzanie. Selon les exigences du client, nous avons fait venir un ing\u00e9nieur sur le site du client pour guider l&#39;installation de la grue. Nous sommes arriv\u00e9s sur le site du client le 16 juillet et sommes retourn\u00e9s \u00e0 notre usine le 29 ao\u00fbt. Voici quelques photos du produit et de l&#39;installation.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"702\" height=\"391\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/experience-case.png\" alt=\"cas d&#039;exp\u00e9rience\" class=\"wp-image-7591\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Service apr\u00e8s-vente<\/h2>\n\n\n\n<p>Une fois les produits DGCRANE vendus, il y a une garantie de 1 \u00e0 2 ans. Notre personnel technique exp\u00e9riment\u00e9 se rendra gratuitement sur place pour guider l&#39;installation de la grue selon la date requise par le client, aider le client \u00e0 r\u00e9gler la grue sur place , guider le test de charge et la mise en service, et former le client.<br>Chaque grue est accompagn\u00e9e d&#39;un manuel et nous pouvons \u00e9galement organiser un guidage technique \u00e0 distance.<br>Il est \u00e0 noter que:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Entretien\u00a0: Un entretien r\u00e9gulier est n\u00e9cessaire, y compris des inspections quotidiennes, mensuelles et annuelles. La premi\u00e8re chose est d&#39;assurer le fonctionnement s\u00fbr et efficace de la grue. Nous pouvons fournir des services de r\u00e9paration et des pi\u00e8ces de rechange si n\u00e9cessaire.<\/li>\n\n\n\n<li>Maintenance\u00a0:\u00a0En cas de panne ou de dysfonctionnement, nous pouvons fournir des services de maintenance rapides et efficaces pour minimiser les temps d&#39;arr\u00eat.<\/li>\n\n\n\n<li>Formation\u00a0: Nous pouvons fournir une formation aux op\u00e9rateurs et au personnel de maintenance pour garantir le fonctionnement s\u00fbr et efficace de la grue.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"679\" height=\"423\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Regular-safety-inspections-of-cranes.png\" alt=\"Inspections de s\u00e9curit\u00e9 r\u00e9guli\u00e8res des grues\" class=\"wp-image-7592\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Crane est le premier fabricant mondial de grues. Il est non seulement responsable de la consultation gratuite des grues, mais fournit \u00e9galement des conseils techniques et une coop\u00e9ration technique correspondants tels que la planification technique, le g\u00e9nie civil, la supervision des \u00e9quipements et l&#39;inspection li\u00e9s aux \u00e9quipements de levage.<br>Les services de grue DGCRANE comprennent le conseil en grue, la conception de solutions de grue, le contr\u00f4le qualit\u00e9 de la fabrication des grues, l&#39;installation de la grue, la maintenance de la grue, etc., un service en ligne 7 heures sur 24 pour r\u00e9soudre vos probl\u00e8mes de grue. Si vous avez des besoins, veuillez nous contacter.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n\n\n<p><strong>1.Quelles qualifications les installateurs de ponts roulants doivent-ils poss\u00e9der\u00a0?<\/strong><br \/>Responsable technique<br \/>Avoir le titre d&#39;ing\u00e9nieur, \u00eatre dipl\u00f4m\u00e9 d&#39;une sp\u00e9cialisation en m\u00e9canique ou en \u00e9lectricit\u00e9 et poss\u00e9der une exp\u00e9rience de travail technique li\u00e9e \u00e0 des projets sous licence.<\/p>\n\n\n\n<p><em>Personnel du syst\u00e8me d\u2019assurance qualit\u00e9<\/em><br>(1) Ing\u00e9nieur assurance qualit\u00e9, avec le titre d&#39;ing\u00e9nieur et une exp\u00e9rience de travail technique li\u00e9e au projet sous licence<br>(2) Personnel responsable de la conception du plan d&#39;installation, du levage, du soudage, de la mise en service, de l&#39;inspection et du syst\u00e8me de contr\u00f4le de la qualit\u00e9<\/p>\n\n\n\n<p>Personnel technique<br>Il n&#39;y a pas moins de 8 professionnels en m\u00e9canique et \u00e9lectricit\u00e9 avec le titre d&#39;ing\u00e9nieur assistant ou sup\u00e9rieur, dont pas moins de 6 avec le titre d&#39;ing\u00e9nieur, avec une exp\u00e9rience de travail technique li\u00e9e au projet sous licence.<\/p>\n\n\n\n<p>Inspecteur<br>Il n&#39;y a pas moins de 4 inspecteurs qualit\u00e9.<\/p>\n\n\n\n<p>Op\u00e9rateur<br>Il n&#39;y a pas moins de 4 installateurs, pas moins de 2 chauffeurs, pas moins de 2 soudeurs et pas moins de 2 \u00e9lectriciens.<\/p>\n\n\n\n<p>Chef de projet<br>Avoir le titre d&#39;ing\u00e9nieur, \u00eatre dipl\u00f4m\u00e9 d&#39;une sp\u00e9cialisation en m\u00e9canique ou en \u00e9lectricit\u00e9 et avoir une exp\u00e9rience professionnelle dans l&#39;installation de machines de levage.<\/p>","protected":false},"excerpt":{"rendered":"R\u00e9ception des marchandises Lorsque le client re\u00e7oit l&#39;\u00e9quipement de levage, les points suivants doivent \u00eatre v\u00e9rifi\u00e9s : Quels plans de pr\u00e9paration DGCRANE \u00e9tablira-t-il pour vous avant l&#39;installation ? 1. Planification pr\u00e9alable \u00e0 l&#39;installation : Plan Avant l&#39;installation, nos ing\u00e9nieurs et nos ma\u00eetres installateurs doivent vous communiquer les d\u00e9tails suivants pour faciliter le bon d\u00e9roulement de l&#39;installation, notamment : Examen sur site : Situation locale [\u2026]","protected":false},"featured_media":7559,"parent":0,"menu_order":0,"template":"","posts_category":[351],"posts_tag":[61,538,539,6,537],"class_list":["post-7558","posts","type-posts","status-publish","has-post-thumbnail","hentry","posts_category-blog","posts_tag-bridge-crane","posts_tag-crane-installation","posts_tag-crane-services","posts_tag-overhead-crane","posts_tag-overhead-crane-installation"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/xmxposts\/7558"}],"collection":[{"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":13,"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/xmxposts\/7558\/revisions"}],"predecessor-version":[{"id":11475,"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/xmxposts\/7558\/revisions\/11475"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/media\/7559"}],"wp:attachment":[{"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/media?parent=7558"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/posts_category?post=7558"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.dgcrane.com\/fr\/wp-json\/wp\/v2\/posts_tag?post=7558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}