{"id":7558,"date":"2024-05-22T09:37:29","date_gmt":"2024-05-22T09:37:29","guid":{"rendered":"https:\/\/www.dgcrane.com\/?post_type=posts&#038;p=7558"},"modified":"2024-12-20T02:06:19","modified_gmt":"2024-12-20T02:06:19","slug":"overhead-crane-installation-and-after-sales-service","status":"publish","type":"posts","link":"https:\/\/www.dgcrane.com\/es\/posts\/overhead-crane-installation-and-after-sales-service\/","title":{"rendered":"Instalaci\u00f3n de puente gr\u00faa y servicio posventa"},"content":{"rendered":"<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"693\" height=\"518\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Overhead-crane-installation.png\" alt=\"Instalaci\u00f3n de puente gr\u00faa\" class=\"wp-image-7559\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Recepci\u00f3n de mercanc\u00edas<\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"783\" height=\"701\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Receiving-goods.png\" alt=\"Recepci\u00f3n de mercanc\u00edas\" class=\"wp-image-7560\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Cuando el cliente recibe el equipo de elevaci\u00f3n, se debe comprobar lo siguiente:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Inspecci\u00f3n: compruebe si la lista se compara con el objeto f\u00edsico (si la cantidad de productos est\u00e1 completa, si las piezas est\u00e1n da\u00f1adas y si la informaci\u00f3n aleatoria est\u00e1 completa).<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">\u00bfQu\u00e9 planes de preparaci\u00f3n har\u00e1 DGCRANE para usted antes de la instalaci\u00f3n?<\/h2>\n\n\n\n<p>1. Planificaci\u00f3n previa a la instalaci\u00f3n: plano<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1808\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/drawings-scaled.jpg?w=1000\" alt=\"dibujos\" class=\"wp-image-7561\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/drawings-scaled.jpg 2560w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/drawings-1536x1085.jpg 1536w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/drawings-2048x1447.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Antes de la instalaci\u00f3n, nuestros ingenieros y maestros de instalaci\u00f3n deben comunicarse con usted los siguientes detalles para facilitar el buen progreso de la instalaci\u00f3n, que incluyen:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Revisi\u00f3n de los planos de construcci\u00f3n de la planta:<\/strong>Verifique cuidadosamente el plano de dise\u00f1o del edificio para asegurarse de que las dimensiones estructurales clave de la planta cumplan con los requisitos de las dimensiones de instalaci\u00f3n de la gr\u00faa.<\/li>\n\n\n\n<li><strong>Lista de materiales y equipos:<\/strong>Durante todo el proceso de instalaci\u00f3n de la gr\u00faa, el instalador enumer\u00f3 una lista completa de necesidades.<\/li>\n\n\n\n<li><strong>Calendario de instalaci\u00f3n:<\/strong>Los instaladores necesitan un calendario claro para evitar retrasos en la construcci\u00f3n en curso.<\/li>\n\n\n\n<li><strong>Aviso de instalaci\u00f3n:<\/strong>Confirmar el cronograma de instalaci\u00f3n, la cooperaci\u00f3n del personal (ingenieros mec\u00e1nicos y el\u00e9ctricos, orientaci\u00f3n t\u00e9cnica durante el proceso de instalaci\u00f3n), el progreso de la planificaci\u00f3n, la seguridad de la construcci\u00f3n y la limpieza del sitio; al mismo tiempo, es necesario investigar el entorno en el sitio (preparaci\u00f3n de herramientas de instalaci\u00f3n, determinar el voltaje de suministro de energ\u00eda del sitio de instalaci\u00f3n del comprador, para garantizar que el cliente tenga las condiciones b\u00e1sicas requeridas para la instalaci\u00f3n.\uff09<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Revisi\u00f3n in situ: situaci\u00f3n local<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"716\" height=\"516\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Check-local-situation.png\" alt=\"\" class=\"wp-image-7562\"><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Los instaladores har\u00e1n los preparativos pertinentes antes de instalar la gr\u00faa para garantizar que los veh\u00edculos, la maquinaria y el equipo de instalaci\u00f3n puedan pasar libremente y garantizar el buen progreso de la instalaci\u00f3n. Las consideraciones clave incluyen:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Verifique el grado de coincidencia de las l\u00edneas el\u00e9ctricas locales, fuentes de alimentaci\u00f3n y productos del cliente.<\/li>\n\n\n\n<li>El estado del pavimento en el lugar de instalaci\u00f3n.<\/li>\n\n\n\n<li>Sistema de techo y plomer\u00eda.<\/li>\n\n\n\n<li>L\u00e1mparas de techo.<\/li>\n\n\n\n<li>Preparaci\u00f3n de equipos de soldadura.<\/li>\n\n\n\n<li>Garantizaremos con cada cliente las condiciones b\u00e1sicas para la instalaci\u00f3n de la gr\u00faa.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><\/li>\n<\/ul>\n\n\n\n<p>Antes de instalar la gr\u00faa, se deben cumplir las condiciones de instalaci\u00f3n: la limpieza del lugar de instalaci\u00f3n, la preparaci\u00f3n de las instalaciones de seguridad, la provisi\u00f3n de las condiciones de suministro de energ\u00eda, la preparaci\u00f3n del equipo de instalaci\u00f3n, la preparaci\u00f3n para la instalaci\u00f3n de la v\u00eda del trole y la l\u00ednea de deslizamiento de la fuente de alimentaci\u00f3n del carro, etc.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Identificaci\u00f3n de peligros: la seguridad es lo primero<\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"648\" height=\"395\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Hazard-identification.png\" alt=\"Identificaci\u00f3n de peligros\" class=\"wp-image-7563\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Este paso implica identificar peligros potenciales que pueden interrumpir el proceso de instalaci\u00f3n, tales como:<\/li>\n\n\n\n<li>Peligro de electricidad<\/li>\n\n\n\n<li>Peligro mec\u00e1nico<\/li>\n\n\n\n<li>Temperatura extrema o exposici\u00f3n a sustancias qu\u00edmicas<\/li>\n\n\n\n<li>Precauciones para trabajos a\u00e9reos<\/li>\n\n\n\n<li>Cualquier otro riesgo que el instalador considere relevante<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Prueba de carga<\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Load-test.jpg?w=1000\" alt=\"Prueba de carga\" class=\"wp-image-7564\" srcset=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Load-test.jpg 1600w, https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Load-test-1536x1152.jpg 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Una vez completada la instalaci\u00f3n del puente gr\u00faa, es el momento de realizar la prueba de carga. Los pasos de la prueba son los siguientes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Experimento de funcionamiento de polipasto, viga de gr\u00faa y carro de gr\u00faa.<\/li>\n\n\n\n<li>Control del funcionamiento del dispositivo de seguridad<\/li>\n\n\n\n<li>Prueba de carga de 125% del peso de elevaci\u00f3n nominal de la gr\u00faa<\/li>\n\n\n\n<li>Mantenga siempre los registros de las pruebas de carga a un f\u00e1cil acceso para referencia futura.<\/li>\n\n\n\n<li>Prueba de carga, prueba de carga din\u00e1mica (1h) y prueba de carga est\u00e1tica (3*10 min), verifican principalmente si se pueden operar las funciones de cada mecanismo y transmisi\u00f3n.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">\u00bfC\u00f3mo instalar?<a href=\"https:\/\/www.dgcrane.com\/es\/posts\/assembly-and-installation-of-single-girder-overhead-cranes\/\"> Pasos de montaje del puente gr\u00faa.<\/a><\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"478\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Assembly-steps-of-overhead-crane.png\" alt=\"Pasos de montaje del puente gr\u00faa.\" class=\"wp-image-7577\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>El primer paso en la instalaci\u00f3n es garantizar que existan medidas de protecci\u00f3n de seguridad en el sitio, verificar si la instalaci\u00f3n de la viga de la gr\u00faa est\u00e1 en buenas condiciones y luego implementar la instalaci\u00f3n.<br>PASO 1: Preinstalado<br>PASO 2: Montaje e instalaci\u00f3n<br>PASO 3: Prueba y ajuste final<\/p>\n\n\n\n<p><strong>Servicio posventa que podemos brindarle:<\/strong><\/p>\n\n\n\n<p>En el proceso de fabricaci\u00f3n de la gr\u00faa, cooperaremos plenamente con la disposici\u00f3n de los planos, la supervisi\u00f3n del producto, la inspecci\u00f3n y la aceptaci\u00f3n para garantizar que usted reciba un puente gr\u00faa de alta calidad, de la siguiente manera:<\/p>\n\n\n\n<p><strong><em>1. Acerca del certificado de calificaci\u00f3n<\/em><\/strong><br>DGCRANE tiene certificaci\u00f3n ISO, certificaci\u00f3n CCC, certificaci\u00f3n CE, etc., podemos proporcionarle la certificaci\u00f3n de terceros del puente gr\u00faa que necesita. En la actualidad, la certificaci\u00f3n de exportaci\u00f3n internacional incluye principalmente siete categor\u00edas, a saber, ISO9000, marca CCC y certificaci\u00f3n T\u00fcV. , Certificaci\u00f3n UL, certificaci\u00f3n CE, certificaci\u00f3n RoHS, inspecci\u00f3n de productos SGS.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>ISO (Organizaci\u00f3n de Certificaci\u00f3n de Normas Internacionales)<\/td><td>Una alianza global de agencias internacionales de normalizaci\u00f3n (agencias miembros de ISO).<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/ISO.png\" alt=\"logotipo ISO\" width=\"200\" height=\"152\" class=\"alignnone wp-image-7587\"><\/td><\/tr><tr><td>CCC (certificaci\u00f3n obligatoria de China)<\/td><td>La certificaci\u00f3n obligatoria de China se conoce como CCC, y la marca 3C se conoce como Transporte, importaci\u00f3n, venta y uso en servicios comerciales.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/ccc-e1734659859154.png\" alt=\"logotipo de la CCC\" width=\"200\" height=\"134\" class=\"alignnone wp-image-7586\"><\/td><\/tr><tr><td>Certificaci\u00f3n TUV<\/td><td>T\u00dc Vcertification Es una certificaci\u00f3n de terceros emitida por T\u00fcV NORD, el organismo de certificaci\u00f3n oficial del gobierno alem\u00e1n.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/TUV.png\" alt=\"Logotipo T\u00dcV\" width=\"200\" height=\"82\" class=\"alignnone wp-image-7585\"><\/td><\/tr><tr><td>Certificaci\u00f3n UL (Underwriter Laboratories Inc)<\/td><td>Utiliza m\u00e9todos de prueba cient\u00edficos para determinar el grado de da\u00f1o o da\u00f1o a la vida y la propiedad causados por diversos materiales, instalaciones, productos, instalaciones, edificios, etc.; Determinar, preparar y emitir normas apropiadas y ayudar a reducir y prevenir vidas.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/UL.png\" alt=\"Logotipo UL\" width=\"200\" height=\"87\" class=\"alignnone wp-image-7584\"><\/td><\/tr><tr><td>Certificaci\u00f3n CE<\/td><td>Es una marca de certificaci\u00f3n de seguridad y se considera un pasaporte para que los fabricantes abran y entren en el mercado europeo.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/CE.png\" alt=\"CE\" width=\"200\" height=\"65\" class=\"alignnone wp-image-7583\"><\/td><\/tr><tr><td>SGS (Notaria General de Suiza)<\/td><td>Es el organismo l\u00edder a nivel mundial en inspecci\u00f3n, identificaci\u00f3n, pruebas y certificaci\u00f3n, que ofrece una amplia gama de an\u00e1lisis f\u00edsicos, qu\u00edmicos y metalogr\u00e1ficos, incluidas pruebas destructivas y no destructivas, proporcionando un conjunto completo de inspecciones cuantitativas y de calidad y servicios t\u00e9cnicos relacionados, y proporcionando a los clientes servicios de pre-prueba.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/SGS.png\" alt=\"SGS\" width=\"200\" height=\"101\" class=\"alignnone wp-image-7582\"><\/td><\/tr><tr><td>Certificaci\u00f3n RoHS<\/td><td>Regula principalmente los est\u00e1ndares de materiales y procesos de los equipos el\u00e9ctricos de los puentes gr\u00faa para hacerlos m\u00e1s propicios para la salud humana y la protecci\u00f3n del medio ambiente.<\/td><td><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/RoHS.png\" alt=\"RoHS\" width=\"200\" height=\"103\" class=\"alignnone wp-image-7581\"><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><em><strong>2.<a href=\"https:\/\/www.dgcrane.com\/es\/posts\/shipping-time-container-tracking-load-calculator-tool-secret-weapon-of-the-10-years-experienced-salesman\/\">Respecto al transporte y cargos<\/a><\/strong><\/em><\/p>\n\n\n\n<p>DGCRANE proporcionar\u00e1 embalaje de acuerdo con los est\u00e1ndares internacionales de exportaci\u00f3n: la viga principal debe cortarse durante el transporte y se atornillar\u00e1 despu\u00e9s de enviarse al \u00e1rea local, lo cual es fuerte y confiable. La hostia se empaqueta en tiras de colores impermeables y los repuestos y equipos el\u00e9ctricos se empaquetan en cajas de madera fumigadas. DGCRANE puede proporcionar una variedad de transporte con gr\u00faa, como transporte de contenedores\/carga a granel\/env\u00edo LCL, transporte por tren.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"697\" height=\"425\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Crane-beam-packaging.png\" alt=\"Embalaje de viga de gr\u00faa\" class=\"wp-image-7590\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><em><strong>3.Acerca de nuestro caso de experiencia<\/strong><\/em><br><a href=\"https:\/\/www.dgcrane.com\/es\/posts\/installation-and-test-run-of-16-ton-overhead-cranes-in-tanzania\/\">Instalaci\u00f3n y operaci\u00f3n de prueba de un puente gr\u00faa de 16 toneladas en Tanzania<\/a><\/p>\n\n\n\n<p>Se trata de una gr\u00faa puente monoviga de LDC con un peso de elevaci\u00f3n de 16 toneladas exportada a Tanzania. De acuerdo con los requisitos del cliente, organizamos que un ingeniero fuera al sitio del cliente para guiar la instalaci\u00f3n de la gr\u00faa. Llegamos al sitio del cliente el 16 de julio y regresamos a nuestra f\u00e1brica el 29 de agosto. A continuaci\u00f3n se muestran algunas im\u00e1genes del producto y de la instalaci\u00f3n.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"702\" height=\"391\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/experience-case.png\" alt=\"caso-experiencia\" class=\"wp-image-7591\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Servicio postventa<\/h2>\n\n\n\n<p>Una vez vendidos los productos de DGCRANE, existe una garant\u00eda de 1 a 2 a\u00f1os. Nuestro personal t\u00e9cnico experimentado ir\u00e1 al sitio sin cargo para guiar la instalaci\u00f3n de la gr\u00faa de acuerdo con la fecha requerida por el cliente, ayudar al cliente a ajustar la gr\u00faa en el sitio, guiar la prueba de carga y la puesta en servicio, y capacitar al cliente.<br>Cada gr\u00faa va acompa\u00f1ada de un manual, y tambi\u00e9n podemos gestionar asesoramiento t\u00e9cnico remoto.<br>Cabe resaltar que:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mantenimiento: Es necesario un mantenimiento regular, que incluye inspecciones diarias, mensuales y anuales. Lo primero es garantizar el funcionamiento seguro y eficiente de la gr\u00faa. Podemos proporcionar servicios de reparaci\u00f3n y repuestos seg\u00fan sea necesario.<\/li>\n\n\n\n<li>Mantenimiento: si ocurre una falla o mal funcionamiento, podemos brindar servicios de mantenimiento oportunos y eficientes para minimizar el tiempo de inactividad.<\/li>\n\n\n\n<li>Capacitaci\u00f3n: Podemos brindar capacitaci\u00f3n a operadores y personal de mantenimiento para garantizar el funcionamiento seguro y eficiente de la gr\u00faa.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"679\" height=\"423\" src=\"https:\/\/www.dgcrane.com\/wp-content\/uploads\/2024\/05\/Regular-safety-inspections-of-cranes.png\" alt=\"Inspecciones peri\u00f3dicas de seguridad de gr\u00faas.\" class=\"wp-image-7592\"\/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>Crane es el principal fabricante de gr\u00faas del mundo. No solo se encarga de la consulta gratuita de gr\u00faas, sino que tambi\u00e9n proporciona la orientaci\u00f3n t\u00e9cnica correspondiente y la cooperaci\u00f3n t\u00e9cnica, como la planificaci\u00f3n de ingenier\u00eda, la ingenier\u00eda civil, la supervisi\u00f3n de equipos y la inspecci\u00f3n relacionada con los equipos de elevaci\u00f3n.<br>Los servicios de gr\u00faas de DGCRANE incluyen consultor\u00eda de gr\u00faas, dise\u00f1o de soluciones de gr\u00faas, control de calidad de fabricaci\u00f3n de gr\u00faas, instalaci\u00f3n de gr\u00faas, mantenimiento de gr\u00faas, etc., servicio en l\u00ednea 7*24 horas para resolver sus problemas con gr\u00faas. Si tiene alguna necesidad, cont\u00e1ctenos.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">preguntas frecuentes<\/h2>\n\n\n\n<p><strong>1. \u00bfQu\u00e9 cualificaciones deben aprobar los instaladores de gr\u00faas puente?<\/strong><br \/>Responsable t\u00e9cnico<br \/>Tener t\u00edtulo de ingeniero, egresado de carreras afines a mec\u00e1nica o electricidad, y experiencia laboral t\u00e9cnica relacionada con proyectos licenciados.<\/p>\n\n\n\n<p><em>Personal del sistema de aseguramiento de la calidad.<\/em><br>(1) Ingeniero de aseguramiento de calidad, con t\u00edtulo de ingeniero y experiencia laboral t\u00e9cnica relacionada con el proyecto licenciado.<br>(2) Personal responsable del dise\u00f1o del plan de instalaci\u00f3n, elevaci\u00f3n, soldadura, puesta en servicio, inspecci\u00f3n y sistema de control de calidad.<\/p>\n\n\n\n<p>Personal t\u00e9cnico<br>Hay no menos de 8 profesionales mec\u00e1nicos y el\u00e9ctricos con t\u00edtulo de ingeniero asistente o superior, incluidos no menos de 6 con t\u00edtulo de ingeniero, con experiencia laboral t\u00e9cnica relacionada con el proyecto licenciado.<\/p>\n\n\n\n<p>Inspector<br>Hay no menos de 4 inspectores de calidad.<\/p>\n\n\n\n<p>Operador<br>Se cuenta con nada menos que 4 instaladores, nada menos que 2 conductores, nada menos que 2 soldadores y nada menos que 2 electricistas.<\/p>\n\n\n\n<p>L\u00edder del proyecto<br>Contar con el t\u00edtulo de ingeniero, egresado de carreras afines a mec\u00e1nica o electricidad, y tener experiencia laboral en instalaci\u00f3n de maquinaria de elevaci\u00f3n.<\/p>","protected":false},"excerpt":{"rendered":"Recepci\u00f3n de mercanc\u00edas Cuando el cliente recibe el equipo de elevaci\u00f3n, se debe verificar lo siguiente: \u00bfQu\u00e9 planes de preparaci\u00f3n har\u00e1 DGCRANE para usted antes de la instalaci\u00f3n? 1. Planificaci\u00f3n previa a la instalaci\u00f3n: Plano Antes de la instalaci\u00f3n, nuestros ingenieros y maestros de instalaci\u00f3n deben comunicarse con usted los siguientes detalles para facilitar el progreso sin problemas de la instalaci\u00f3n, incluyendo: Revisi\u00f3n en el sitio: Situaci\u00f3n local [\u2026]","protected":false},"featured_media":7559,"parent":0,"menu_order":0,"template":"","posts_category":[351],"posts_tag":[61,538,539,6,537],"class_list":["post-7558","posts","type-posts","status-publish","has-post-thumbnail","hentry","posts_category-blog","posts_tag-bridge-crane","posts_tag-crane-installation","posts_tag-crane-services","posts_tag-overhead-crane","posts_tag-overhead-crane-installation"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/xmxposts\/7558"}],"collection":[{"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":13,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/xmxposts\/7558\/revisions"}],"predecessor-version":[{"id":11475,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/xmxposts\/7558\/revisions\/11475"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/media\/7559"}],"wp:attachment":[{"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/media?parent=7558"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/posts_category?post=7558"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/posts_tag?post=7558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}