{"id":1228,"date":"2013-05-10T01:36:53","date_gmt":"2013-05-10T01:36:53","guid":{"rendered":"https:\/\/www.dgcrane.com\/?post_type=posts&#038;p=1228"},"modified":"2022-10-24T02:54:40","modified_gmt":"2022-10-24T02:54:40","slug":"saudi-arabia-single-girder-overhead-crane-project","status":"publish","type":"posts","link":"https:\/\/www.dgcrane.com\/es\/2013\/12\/saudi-arabia-single-girder-overhead-crane-project\/","title":{"rendered":"Proyecto de puente gr\u00faa monorra\u00edl en Arabia Saud\u00ed"},"content":{"rendered":"<p><em><strong>Puente gr\u00faa monorra\u00edl de Arabia Saud\u00ed<\/strong><\/em><br \/>\r\nProductos: Puente gr\u00faa monorra\u00edl<br \/>\r\nEspecificaci\u00f3n: 5 Toneladas, longitud de vano: 23 M, altura de elevaci\u00f3n: 7 M.<br \/>\r\nCANTIDAD: 1 juego<br \/>\r\nEntregado por: CONTENEDOR DE 40 PIES<\/p>\r\n<p align=\"left\">Este puente gr\u00faa monorra\u00edl de 5 toneladas es el segundo pedido del Sr. Bashir.<\/p>\r\n<p align=\"left\">En el a\u00f1o 2011, el Sr. Bashir nos envi\u00f3 la primera consulta sobre polipastos el\u00e9ctricos de 1 tonelada y 5 toneladas. El Sr. Bashir est\u00e1 muy familiarizado con los equipos de elevaci\u00f3n, ya que nos dio informaci\u00f3n detallada y lo hizo lo suficientemente claro dentro de 2-3 correos.<\/p>\r\n<p>Despu\u00e9s de aclarar todos los detalles como la carga m\u00e1xima de elevaci\u00f3n, la velocidad y el voltaje, el Sr. Bashir desapareci\u00f3. Despu\u00e9s de aclarar todos los detalles, como la carga m\u00e1xima de elevaci\u00f3n, la altura de elevaci\u00f3n, la velocidad y el voltaje, el Sr. Bashir desapareci\u00f3 durante 2 meses. Su orden de compra para los 5 juegos de polipastos el\u00e9ctricos de 1 tonelada y 5 toneladas fue puesta a nuestra disposici\u00f3n en octubre de 2011.<br \/>\r\n<img decoding=\"async\" alt=\"5 juegos de polipastos el\u00e9ctricos\" src=\"\/wp-content\/uploads\/2011\/11\/5-sets-of-electric-hoist.jpg\" width=\"600\" \/><\/p>\r\n<p align=\"left\"><span>Esta es nuestra primera entrega a Arabia Saudita, y muchas gracias al Sr. Bashir, desde esta entrega sabemos que todos los productos exportados a Arabia Saudita deben estar marcados con el origen en el paquete.<\/span><\/p>\r\n<p align=\"left\"><span>En cuanto a este pedido de puente gr\u00faa monorra\u00edl de 5 toneladas de Arabia Saud\u00ed, el Sr. Bashir hizo el pedido despu\u00e9s de que nuestros ingenieros resolvieran con \u00e9xito los problemas que se les plantearon. Cuando comprobamos la disposici\u00f3n de la planta, nuestros ingenieros descubrieron que los pilares de la planta no son colineales. Nuestros ingenieros ofrecen 2 opciones: 1. Plantar algunos pilares para asegurar el funcionamiento del puente gr\u00faa. 2. 2. Gr\u00faa de p\u00f3rtico como alternativa. Despu\u00e9s de comparar los dise\u00f1os y los costes, el Sr. Bashir finalmente confirm\u00f3 el pedido de un puente gr\u00faa de 5 toneladas.<\/span><\/p>\r\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-5333\" alt=\"Entrega de puente gr\u00faa monoviga de 5 toneladas\" src=\"\/wp-content\/uploads\/2011\/11\/5-ton-single-girder-overhead-crane-delivery.jpg\" width=\"600\" \/><br \/>\r\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5334\" title=\"Puente gr\u00faa monorra\u00edl de 5 toneladas viga principal\" alt=\"Puente gr\u00faa monorra\u00edl de Arabia Saud\u00ed\" src=\"\/wp-content\/uploads\/2011\/11\/5-ton-single-girder-overhead-crane-main-bridge-girder.jpg\" width=\"600\" height=\"339\" \/><\/p>","protected":false},"excerpt":{"rendered":"Gr\u00faa a\u00e9rea monorra\u00edl de Arabia Saudita Productos: Gr\u00faa a\u00e9rea monorra\u00edl Especificaci\u00f3n: 5 toneladas, longitud de tramo: 23 M, altura de elevaci\u00f3n: 7 M. CANTIDAD: 1 juego Entregado por: CONTENEDOR DE 40 PIES Esta gr\u00faa a\u00e9rea monorra\u00edl de 5 toneladas es en realidad el segundo pedido del Sr. Bashir. En el a\u00f1o 2011, el Sr. Bashir nos envi\u00f3 la primera consulta para 1 [\u2026]","protected":false},"featured_media":1270,"parent":0,"menu_order":0,"template":"","posts_category":[4],"posts_tag":[7,32,54,27,33,6,34],"class_list":["post-1228","posts","type-posts","status-publish","has-post-thumbnail","hentry","posts_category-cases","posts_tag-crane","posts_tag-crane-news","posts_tag-gantry-crane","posts_tag-hoist","posts_tag-news","posts_tag-overhead-crane","posts_tag-overhead-cranes"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/xmxposts\/1228"}],"collection":[{"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":3,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/xmxposts\/1228\/revisions"}],"predecessor-version":[{"id":1230,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/xmxposts\/1228\/revisions\/1230"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/media\/1270"}],"wp:attachment":[{"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/media?parent=1228"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/posts_category?post=1228"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.dgcrane.com\/es\/wp-json\/wp\/v2\/posts_tag?post=1228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}