{"id":1228,"date":"2013-05-10T01:36:53","date_gmt":"2013-05-10T01:36:53","guid":{"rendered":"https:\/\/www.dgcrane.com\/?post_type=posts&#038;p=1228"},"modified":"2022-10-24T02:54:40","modified_gmt":"2022-10-24T02:54:40","slug":"saudi-arabia-single-girder-overhead-crane-project","status":"publish","type":"posts","link":"https:\/\/www.dgcrane.com\/da\/2013\/12\/saudi-arabia-single-girder-overhead-crane-project\/","title":{"rendered":"Saudi-Arabien Enkeltbj\u00e6lke overheadkranprojekt"},"content":{"rendered":"<p><em><strong>Saudi-Arabien traverskran med enkeltbj\u00e6lke<\/strong><\/em><br \/>\r\nProdukter: Enkeltdrager traverskran<br \/>\r\nSpecifikation: 5 tons, sp\u00e6ndvidde: 23 M, L\u00f8fteh\u00f8jde: 7 M.<br \/>\r\nANTAL: 1 s\u00e6t<br \/>\r\nLeveret af: 40 FODS CONTAINER<\/p>\r\n<p align=\"left\">Denne 5 tons enkeltbj\u00e6lke overheadkran er faktisk den anden ordre fra Mr.Bashir.<\/p>\r\n<p align=\"left\">I \u00e5r 2011 sendte Mr.Bashir os den f\u00f8rste foresp\u00f8rgsel om 1 ton og 5 tons elektriske hejsev\u00e6rker. Mr.Bashir er ganske fortrolig med hejseudstyr, da han gav os sm\u00e5 detaljerede oplysninger og gjorde det klart nok inden for 2-3 mails.<\/p>\r\n<p>Efter at have afklaret alle detaljer som max. Ved at l\u00f8fte last, l\u00f8fteh\u00f8jde, hastighed og sp\u00e6nding forsvandt Mr. Bashir i 2 m\u00e5neder. Hans indk\u00f8bsordre p\u00e5 de 5 s\u00e6t af 1 tons &amp; 5 tons elektrisk hejs blev sendt til os i oktober 2011.<br \/>\r\n<img decoding=\"async\" alt=\"5 s\u00e6t el-hejs\" src=\"\/wp-content\/uploads\/2011\/11\/5-sets-of-electric-hoist.jpg\" width=\"600\" \/><\/p>\r\n<p align=\"left\"><span>Dette er faktisk vores f\u00f8rste levering til Saudi-Arabien, og mange tak til Mr.Bashir, fra denne levering ved vi, at alle eksporterede produkter til Saudi skal v\u00e6re m\u00e6rket med oprindelsen p\u00e5 pakken.<\/span><\/p>\r\n<p align=\"left\"><span>Med hensyn til denne ordre p\u00e5 5 tons Saudi-Arabien enkeltbj\u00e6lke overheadkran, afgav Mr. Bashir ordren, efter at vores ingeni\u00f8rer havde l\u00f8st de problemer, de kom med. Da vi tjekkede anl\u00e6ggets layout, fandt vores ingeni\u00f8rer ud af, at anl\u00e6ggets s\u00f8jler ikke er ko-line\u00e6re. Vores ingeni\u00f8rer tilbyder 2 muligheder: 1. Plant nogle s\u00f8jler for at sikre, at kranen fungerer. 2. Portalkran som alternativ. Efter sammenligning mellem design og omkostninger, bekr\u00e6ftede Mr. Bashir endelig ordren p\u00e5 5 tons traverskran.<\/span><\/p>\r\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-5333\" alt=\"5 tons enkelt drager traverskran levering\" src=\"\/wp-content\/uploads\/2011\/11\/5-ton-single-girder-overhead-crane-delivery.jpg\" width=\"600\" \/><br \/>\r\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5334\" title=\"5 tons enkelt drager traverskran hovedbrodrager\" alt=\"Saudi-Arabien traverskran med enkeltbj\u00e6lke\" src=\"\/wp-content\/uploads\/2011\/11\/5-ton-single-girder-overhead-crane-main-bridge-girder.jpg\" width=\"600\" height=\"339\" \/><\/p>","protected":false},"excerpt":{"rendered":"Saudi-Arabien enkeltdrager traverskran Produkter: Enkeltdrager traverskran Specifikation: 5 tons, sp\u00e6ndvidde: 23 M, L\u00f8fteh\u00f8jde: 7 M. ANTAL: 1 s\u00e6t Leveret af: 40 FEET CONTAINER Denne 5 tons enkeltdrager traverskran er faktisk den anden ordre fra Mr. Bashir. I \u00e5r 2011 sendte Mr. Bashir os den f\u00f8rste foresp\u00f8rgsel for 1 [\u2026]","protected":false},"featured_media":1270,"parent":0,"menu_order":0,"template":"","posts_category":[4],"posts_tag":[7,32,54,27,33,6,34],"class_list":["post-1228","posts","type-posts","status-publish","has-post-thumbnail","hentry","posts_category-cases","posts_tag-crane","posts_tag-crane-news","posts_tag-gantry-crane","posts_tag-hoist","posts_tag-news","posts_tag-overhead-crane","posts_tag-overhead-cranes"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/xmxposts\/1228"}],"collection":[{"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":3,"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/xmxposts\/1228\/revisions"}],"predecessor-version":[{"id":1230,"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/xmxposts\/1228\/revisions\/1230"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/media\/1270"}],"wp:attachment":[{"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/media?parent=1228"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/posts_category?post=1228"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.dgcrane.com\/da\/wp-json\/wp\/v2\/posts_tag?post=1228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}